In addition, the choice of the LCP128 technology came down to a need for optimal control of the bar and restaurant lighting, without the need to train staff continually on how to use it. The self-contained nature of LCP128 meant it was quick to install and could be programmed on-site by the electrical contracts manager, causing minimum disruption to the rebuilding project.